English French
PWB (Piped Water Bangladesh)

Arsenic (and salt) mitigation needs to be a top priority in the Bangladeshi water sector, if the current water stress is to be reduced. Strongly decentralized removal of arsenic cannot be ensured safely. Next to the limited user comfort and costing, the key reason behind this is that priorities in daily social practice often tend to neglect the considerable exposure hazard. A more centralized mitigation of the arsenic- and salt-problem is proposed in the form of small-scale, rural or peri-urban piped water schemes. There are already examples of such systems being active in Bangladesh, but practice shows that most of these initiatives cannot function sustainably in their social, economic and governance settings. PRACTICA, together with partners WASTE, EPRC and Practical Action Bangladesh, aims to assess the functionality of such systems to develop a novel piped water system that considers either of hte two scenarios:

  • The piped delivery of water from safe aquifers of nearby locations to the settlements,
  • The piped delivery of treated water from arsenic-contaminated aquifers.

English French
ECB (Eau canalisée au Bangladesh)

L’atténuation de l’arsenic (et du sel) doit être une priorité absolue dans le secteur de l’eau au Bangladesh, si l’on veut réduire le problème hydrique actuel. L’élimination fortement décentralisée de l’arsenic ne peut être assurée en toute sécurité. Outre le confort et les coûts limités de l’utilisateur, la principale raison en est que les priorités de la pratique sociale quotidienne tendent souvent à négliger le risque considérable d’exposition. Une atténuation plus centralisée du problème de l’arsenic et du sel est proposée sous la forme de réseaux d’adduction d’eau à petite échelle, ruraux ou périurbains. Il existe déjà des exemples de tels systèmes actifs au Bangladesh, mais la pratique montre que la plupart de ces initiatives ne peuvent pas fonctionner de manière durable dans leurs contextes sociaux, économiques et de gouvernance. PRACTICA, en collaboration avec ses partenaires WASTE, EPRC et Practical Action Bangladesh, a pour but d’évaluer la fonctionnalité de tels systèmes pour développer un nouveau système d’adduction d’eau qui considère l’un des deux scénarios suivants :

L’acheminement de l’eau des aquifères sécuritaires des localités voisines vers les agglomérations,

L’acheminement de l’eau traitée à partir d’aquifères contaminés par l’arsenic.

Goals

To analyse factors of success and failure in small-scale, peri-urban and rural piped water initiatives in Bangladesh, in order to develop a sustainable novel concept.

Objectifs

Analyser les facteurs de succès et d’échec des réseaux à petite échelle, périurbaines et rurales au Bangladesh, afin de développer un concept novateur durable.

Activities

  • Assessment of existing piped water initiatives in Bangladesh;
  • Development and analysis of piped water scenario’s with local data and a mathematical assessment model;
  • Survey to determine user acceptance, level of willingness-to-pay, availability of sufficient capacity to manage the initiatives locally;
  • Development of a detailed assessment report.

Activités

  • Évaluation des initiatives d’approvisionnement en eau courante au Bangladesh ;
  • Développement et analyse de scénarios d’eau sous conduite avec des données locales et un modèle d’évaluation mathématique ;
  • Enquête pour déterminer l’acceptation par les utilisateurs, le niveau de volonté de payer, la disponibilité d’une capacité suffisante pour gérer les initiatives au niveau local ;
  • Développement d’un rapport d’évaluation détaillé.

Budget

A total of EUR 38.000 for a period of seven months.

Le budget

Un total de 38 000 euros pour une période de sept mois.

Results

  • Detailed assessment on the success and failure of existing initiatives;
  • Development of a mathematical model to quantify lifecycle costs;
  • Development of a novel concept;
  • Local survey;
  • Development of the final concept and assessment study.

Résultats

  • Évaluation détaillée du succès et de l’échec des initiatives existantes ;
  • Développement d’un modèle mathématique pour quantifier les coûts du cycle de vie ;
  • Développement d’un nouveau concept
  • Enquête locale ;
  • Développement du concept final et étude d’évaluation.

 

Status
Closed
Period
2013 - 2015
client
partners